Quote great lakes dredging2/12/2024 ![]() This project will provide beach fill to towns of Elberon and Sea Girt. Open options totaling $21.1 million remain in low bids pending award bringing total contract to $47.7 million. At this time the base contract was awarded that includes dredging from an offshore borrow area and pumping sand to Allenhurst and Deal beaches. The Sea Bright to Manasquan, Section II Beach Project that was awarded in the third quarter is part of the Sandy Hook to Barnegat Inlet Beach Erosion Control Project.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |